Planning a design and make project

Belajar sambil bermain

Jawab soal-soal ini untuk dapat energi, lalu memancing dan menjelajah. Tanpa akun.

Untuk pendidik: slide pelajaran, catatan ulasan siap pakai untuk Planning a design and make project (Design and Technology, Non-Exam Assessment) — gunakan dalam pelajaranmu, atau jalankan topik sebagai aktivitas kelas interaktif yang dimainkan pembelajar sebagai permainan langsung.

Catatan pelajaran

The project

  • A design-and-make project connects investigation, design development, prototypes and evaluation through relevant evidence. The NEA uses the current board and assessment-year requirements; this general lesson does not set the annual context or provide a personal submission.
  • For example, AQA GCSE D&T 8552 specifies 30–35 hours unless relevant access requirements apply and recommends a concise folder up to 20 A3 pages or equivalent. These are AQA-specific directions, not a universal GCSE hour or page rule. Check the current specification and teacher instructions for the course being taken.

Project requirements have different sources

Project requirements have different sourcesSourceWhat to establishCurrent boardguidanceContext, format and assessmentrequirementsUser investigationNeeds and conditions of useDesignspecificationJustified measurable criteriaWorkshop planningResources, controls and feasiblemethods

Stages

  • Investigate a problem, users and context, then develop a brief and justified, testable requirements. A client commissions or sets requirements and may be different from users. Use evidence to develop ideas through sketches, CAD and suitable models.
  • A prototype is a representation chosen to investigate a design question: it may test shape, interaction, mechanism or an integrated function. Return to investigation, modelling or evaluation when needed rather than following a rigid one-way sequence. Record actual decisions and outcomes.

Planning

  • Break work into manageable tasks with estimated duration, dependencies and checkpoints. A Gantt chart places task bars against a time axis; a flowchart explains process sequence and decision routes. Neither alone guarantees feasibility.
  • Include ordering lead times, equipment availability, skills, curing or waiting periods where relevant, and contingency for revision. The illustrative four-week table is a planning example, not an NEA allowance or board timetable. It shows that later tasks depend on earlier evidence and approved readiness.
  • A cutting list identifies material, part quantities and dimensions with units and relevant allowances or tolerances. A materials list supports ordering; a cost plan includes stock yield, consumables, processes and other relevant resources. Implement suitable risk controls and plan quality checks before making.

Illustrative four-week project plan

Illustrative four-week project planTaskPlannedwindowReadiness or dependencyInvestigate andspecifyWeek 1Access to relevantusers/evidenceModel and reviewWeeks1–2Initial requirements;materials availableMake selectedprototypeWeeks2–3Reviewed model; approvedresources/controlsTest, revise andevaluateWeeks3–4Relevant prototype and testreadiness

The portfolio

  • Communicate selected relevant evidence using clear annotations and organised records. Research, sketches, models, photographs, test results and evaluation should explain decisions, not merely decorate pages. Follow the current permitted format and assessment rules.
  • The reused original phone-stand sketch shows how notes identify a proposed material and functional features. It supplies no tested dimensions or verified performance. A portfolio must distinguish what is proposed from what the actual evidence establishes.

Annotations communicate a proposal

Annotations communicate a proposal

Making the prototype

  • Select material grades, tools and processes that can meet the requirements with available resources and safe authorised methods. Plan checks against tolerances and other criteria at suitable stages, and record departures from the plan with reasons.
  • After an unsuccessful result, stop any unsafe activity and review the requirement, test conditions, measurement and controls before revising. Diagnose a supported cause, make an appropriate change and retest. A change may reveal a trade-off or fail to help, so record the outcome honestly.

Review a failed result

Review a failed resultStopunsafeactivityReviewmethod andevidenceRevisewith areasonRetestwithcontrols

Evaluating

  • Evaluate throughout development and at completion against justified requirements. Use relevant user feedback alongside objective evidence. A small or biased sample does not represent all users; a preference does not prove strength, safety or durability.
  • State met, unmet and untested requirements with reasons, prioritise supported improvements and explain limitations. Consider how a stated commercial production scale would change tooling, material use, assembly, quality, cost or recovery; a one-off prototype process does not automatically transfer unchanged.

Make the evaluation traceable

Make the evaluation traceableRequirementEvidenceConclusionA statedmeasurablecriterionRelevant resultand conditionsMet, unmet or notyet testedA user needRelevant feedbackand observed useSupported findingand sample limitsA proposedrevisionReason andfollow-up resultBenefit, trade-offor unresolved issue

Slide

Sign up free to view the lesson slides

Step through every slide for this topic — plus flashcards and revision notes — with a free account.

Soal latihan

Pratinjau gratis — 8 dari 31 soal. Daftar untuk melihat semuanya.
  1. 1.What is a portfolio?

    Easy
    • Aa record of design development and evidence
    • Ba tool
    • Ca finish
    • Da joint
  2. 2.What is a prototype?

    Easy
    • Aonly a fully finished saleable product
    • Bonly a protective coating
    • Conly the final production batch
    • Da representation used to investigate or test an aspect of a design
  3. 3.What is a Gantt chart?

    Easy
    • Aa map
    • Ba flow chart
    • Ca bar chart showing planned tasks over time
    • Da pie chart
  4. 4.What is a flow chart in making?

    Easy
    • Aa list
    • Ba diagram of the sequence of making steps
    • Ca time plan
    • Da drawing
  5. 5.What is a cutting list?

    Easy
    • Aa list of specified parts, quantities and dimensions to cut
    • Ba tool list
    • Ca time plan
    • Da drawing
  6. 6.Why write a risk assessment?

    Easy
    • Ato increase cost
    • Bto avoid tools
    • Cto avoid work
    • Dto identify hazards and control them
  7. 7.Why identify a client or user?

    Easy
    • Ato avoid testing
    • Bto increase cost
    • Cto investigate relevant needs and turn them into testable requirements
    • Dto avoid research
  8. 8.What is quality control in making?

    Easy
    • Aavoiding checks
    • Bchecking work against tolerances and the specification
    • Cignoring errors
    • Dhiding faults

Unlock all 31 questions & more

Buat akun gratis untuk melihat setiap soal, slide, kartu flash, dan catatan ulasan topik ini.

Soal ujian lampau

Latihan soal ujian lampau untuk topik ini segera hadir.
Segera hadir